Plastics Manufacturing Warehouse and Headquarters
Industrial/Concrete
The multiphase project consisted of 40 acres of site development, utility upgrades, and a 60,000 SF warehouse.
Phase IA of the project included 40 acres of site development, 500,000 CY of earthwork, a parking lot expansion, and utility upgrades. Phase IB had the 60,000 SF warehouse of the future four-phase 600,000 SF facility. Work included foundations, steel erection, roofing, and paneling. The racking area on the floor slab required a super-flat specification for an automated racking system to be achieved over six trench drains. The team completed the entire slab in five pours with a quality end product. Mosites utilized a plate dowel system and custom foam forms for the construction joints.