Case Study –Prefabrication

Project: CMU Forbes Beeler Apartments

Leveraging prefabrication and off-site construction was a key strategy in driving efficiency, quality, and schedule performance — resulting in a three-month schedule savings and delivering the project significantly under budget.

3 Mo. Schedule Savings

Reduced Field Labor

Less Jobsite Waste

By shifting work off-site and coordinating these efforts during preconstruction, Mosites minimized jobsite congestion, reduced waste, and improved overall installation efficiency for a faster, more predictable construction process.

Strong projects start with a disciplined, team-driven preconstruction process. Mosites engages early to align project goals, establish clear communication, and keep the entire team focused on what matters most—cost, schedule, and constructability. We lead a structured approach that keeps decisions organized and the process moving forward. Through ongoing coordination, real-time feedback, and clear documentation, our team ensures everyone stays aligned as the design evolves. Cost is integrated into every step. We evaluate options as they are developed and provide direct, actionable comparisons to support informed decisions. On this project, that included analyzing multiple exterior façade systems and guiding the team toward solutions that balanced design intent, budget, and long-term performance. The result is a streamlined preconstruction process that reduces uncertainty, strengthens decision-making, and sets the project up for successful execution.

Exterior Wall Panels

Delivered with temporary windows and handrails, allowing rapid enclosure and enabling concrete placement through adverse weather including rain and winter months.

Stair Systems with Pre-Installed treads

Allowed immediate use following steel erection, eliminating the need for temporary stairs and supporting efficient vertical access during concrete operations.

Pre-Wired Electrical Devices

Devices pre-wired off-site, reducing field installation time to mounting and final connections at panels.

Prefabricated Roof Blocking

Fabricated by Mosites crews at the Oakdale warehouse, ensuring quality control and efficient on-site installation.